MULTIPLE ACTIVITY CHART

MULTIPLE ACTIVITY CHART

Worker-machine process chart and gang process chart fall in the category of multiple activity charts. A worker-machine chart is used for recording and analyzing the working relationship between operator and machine on which he works. It is drawn to time scale. Analysis of the chart can help in better utilization of both worker and machine time. The possibility of one worker attending more than one machine is also sought from the use of this chart.
A gang process chart is similar to worker-machine chart, and is used when several workers operate one machine. The chart helps in exploring the possibility of reducing both the operator time and idle machine time.

SIMO CHART:
simo chart is another left-hand right-hand chart with the difference that it is drawn to time scale and in terms of basic motions called therbligs. It is used when the work cycle is highly repetitive and of very short duration. 


References: - www.nptel.iitm.ac.in/


Comments

Post a Comment

Popular posts from this blog

Boiler Mounting - Water Level Indicator

WATER LEVEL INDICATOR Function:   It is indicates the water level inside the boiler to an observer. Working:  The water of the boiler comes into the glass tube through the lower tube and the steam through the upper tube. The water then stands in the glass tube at the same level as in the boiler. Two cocks are used to control the passage of between the boiler and the glass tube while the third cock is in used to discharge some of the water from inside the boiler to see whether the gauge is in proper order or not. The glass tube is protected by means of a cover, made of specially toughened glass, which will prevent any accident that may happen due to breaking of glass tube. It is used for ordinary boilers. Image - Water Level Indicator Figure - Water Level Indicator

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 ...

Boiler Mounting - Blow off cock

BLOW OFF COCK Functions: ·         To discharge a portion of water when the boiler is in operation to blowout mud, scale or sediment periodically. ·         To empty the boiler, when necessary for cleaning, inspection & repair. ·         It is fitted on the boiler shell directly or to a short branch at the lowest part of the water space. This pipe is known as blow-down pipe. Working:   In order to operate the valve, the rectangular slot is brought in line with the passage of the body. This is possible by rotating the plug with the help of wheel. When the slot is placed in this position, the cock is opened and all the impurities, mud, sediments etc. Start flowing out of the boiler and they are removed. When the slot is brought at right angles to the passage of the body, the cock is closed. Image - Blow Off Cock Fig - Blow Off Cock...