Skip to main content

Industrial Engineering - INVENTORY

INVENTORY

INTRODUCTION
THE AMOUNT OF MATERIAL, A COMPANY HAS IN STOCK AT A SPECIFIC TIME IS KNOWN AS INVENTORY OR IN TERMS OF MONEY IT CAN BE DEFINED AS THE TOTAL CAPITAL INVESTMENT OVER ALL THE MATERIALS STOCKED IN THE COMPANY AT ANY SPECIFIC TIME. INVENTORY MAY BE IN THE FORM OF,
  • RAW MATERIAL INVENTORY
  • IN PROCESS INVENTORY
  • FINISHED GOODS INVENTORY
  • SPARE PARTS INVENTORY
  • OFFICE STATIONARY ETC.
AS A LOT OF MONEY IS ENGAGED IN THE INVENTORIES ALONG WITH THEIR HIGH CARRYING COSTS, COMPANIES CANNOT AFFORD TO HAVE ANY MONEY TIED IN EXCESS INVENTORIES. ANY EXCESSIVE INVESTMENT IN INVENTORIES MAY PROVE TO BE A SERIOUS DRAG ON THE SUCCESSFUL WORKING OF AN ORGANIZATION. THUS THERE IS A NEED TO MANAGE OUR INVENTORIES MORE EFFECTIVELY TO FREE THE EXCESSIVE AMOUNT OF CAPITAL ENGAGED IN THE MATERIALS.
WHY INVENTORIES?
INVENTORIES ARE NEEDED BECAUSE DEMAND AND SUPPLY CAN NOT BE MATCHED FOR PHYSICAL AND ECONOMICAL REASONS. THERE ARE SEVERAL OTHER REASONS FOR CARRYING INVENTORIES IN ANY ORGANIZATION.
  • TO SAFE GUARD AGAINST THE UNCERTAINTIES IN PRICE FLUCTUATIONS, SUPPLY CONDITIONS, DEMAND CONDITIONS, LEAD TIMES, TRANSPORT CONTINGENCIES ETC.
  • TO REDUCE MACHINE IDLE TIMES BY PROVIDING ENOUGH IN-PROCESS INVENTORIES AT APPROPRIATE LOCATIONS.
  • TO TAKE ADVANTAGES OF QUANTITY DISCOUNTS, ECONOMY OF SCALE IN TRANSPORTATION ETC.
  • TO DECOUPLE OPERATIONS I.E. TO MAKE ONE OPERATION'S SUPPLY INDEPENDENT OF ANOTHER'S SUPPLY. THIS HELPS IN MINIMIZING THE IMPACT OF BREAK DOWNS, SHORTAGES ETC. ON THE PERFORMANCE OF THE DOWN STREAM OPERATIONS. MOREOVER OPERATIONS CAN BE SCHEDULED INDEPENDENT OF EACH OTHER IF OPERATIONS ARE DECOUPLED.
  •  TO REDUCE THE MATERIAL HANDLING COST OF SEMI-FINISHED PRODUCTS BY MOVING THEM IN LARGE QUANTITIES BETWEEN OPERATIONS.
  • TO REDUCE CLERICAL COST ASSOCIATED WITH ORDER PREPARATION, ORDER PROCUREMENT ETC.
INVENTORY COSTS
IN ORDER TO CONTROL INVENTORIES APPROPRIATELY, ONE HAS TO CONSIDER ALL COST ELEMENTS THAT ARE ASSOCIATED WITH THE INVENTORIES. THERE ARE FOUR SUCH COST ELEMENTS, WHICH DO AFFECT COST OF INVENTORY.
  • UNIT COST: IT IS USUALLY THE PURCHASE PRICE OF THE ITEM UNDER CONSIDERATION. IF UNIT COST IS RELATED WITH THE PURCHASE QUANTITY, IT IS CALLED AS DISCOUNT PRICE.
  • PROCUREMENT COSTS: THIS INCLUDES THE COST OF ORDER PREPARATION, TENDER PLACEMENT, COST OF POSTAGES, TELEPHONE COSTS, RECEIVING COSTS, SET UP COST ETC.
  • CARRYING COSTS: THIS REPRESENTS THE COST OF MAINTAINING INVENTORIES IN THE PLANT. IT INCLUDES THE COST OF INSURANCE, SECURITY, WAREHOUSE RENT, TAXES, INTEREST ON CAPITAL ENGAGED, SPOILAGE, BREAKAGE ETC.
  • STOCKOUT COSTS: THIS REPRESENTS THE COST OF LOSS OF DEMAND DUE TO SHORTAGE IN SUPPLIES. THIS INCLUDES COST OF LOSS OF PROFIT, LOSS OF CUSTOMER, LOSS OF GOODWILL, PENALTY ETC.
IF ONE YEAR PLANNING HORIZON IS USED, THE TOTAL ANNUAL COST OF INVENTORY CAN BE EXPRESSED AS:

TOTAL ANNUAL INVENTORY COST = COST OF ITEMS + ANNUAL PROCUREMENT COST + ANNUAL CARRYING COST  +  STOCKOUT COST

VARIABLES IN INVENTORY MODELS
D = TOTAL ANNUAL DEMAND (IN UNITS)
Q = QUANTITY ORDERED (IN UNITS)
Q* = OPTIMAL ORDER QUANTITY (IN UNITS)
R = REORDER POINT (IN UNITS)
R* = OPTIMAL REORDER POINT (IN UNITS)
L = LEAD TIME
S = PROCUREMENT COST (PER ORDER)
C = COST OF THE INDIVIDUAL ITEM (COST PER UNIT)
I = CARRYING COST PER UNIT CARRIED (AS A PERCENTAGE OF UNIT COST C)
K = STOCKOUT COST PER UNIT OUT OF STOCK
P = PRODUCTION RATE OR DELIVERY RATE
DL = DEMAND PER UNIT TIME DURING LEAD TIME
DL = TOTAL DEMAND DURING LEAD TIME
TC = TOTAL ANNUAL INVENTORY COSTS
TC* = MINIMUM TOTAL ANNUAL INVENTORY COSTS
NUMBER OF ORDERS PER YEAR = 


TOTAL PROCUREMENT COST PER YEAR = S.D / Q

TOTAL CARRYING COST PER YEAR = CARRYING COST PER UNIT * UNIT COST * AVERAGE INVENTORY PER CYCLE


COST OF ITEMS PER YEAR = ANNUAL DEMAND * UNIT COST
                                              = D.C

TOTAL ANNUAL INVENTORY COST (TC) =  


THE OBJECTIVE OF INVENTORY MANAGEMENT TEAM IS TO MINIMIZE THE TOTAL ANNUAL INVENTORY COST. A SIMPLIFIED GRAPHICAL PRESENTATION IN WHICH COST OF ITEMS, PROCUREMENT COST AND CARRYING COST ARE DEPICTED 


IT CAN BE SEEN THAT LARGE VALUES OF ORDER QUANTITY Q RESULT IN LARGE CARRYING COST. SIMILARLY, WHEN ORDER QUANTITY Q IS LARGE, FEWER ORDERS WILL BE PLACED AND PROCUREMENT COST WILL DECREASE ACCORDINGLY. THE TOTAL COST CURVE INDICATES THAT THE MINIMUM COST POINT LIES AT THE INTERSECTION OF CARRYING COST AND PROCUREMENT COST CURVES.

INVENTORY OPERATING DOCTRINE
WHEN MANAGING INVENTORIES, OPERATIONS MANAGER HAS TO MAKE TWO IMPORTANT DECISIONS:
  • WHEN TO REORDER THE STOCK (I.E. TIME TO REORDER OR REORDER POINT)
  • HOW MUCH STOCK TO REORDER (I.E. ORDER QUANTITY)
REORDER POINT IS USUALLY A PREDETERMINED INVENTORY LEVEL, WHICH SIGNALS THE OPERATIONS MANAGER TO START THE PROCUREMENT PROCESS FOR THE NEXT ORDER. ORDER QUANTITY IS THE ORDER SIZE.




INVENTORY MODELLING
THIS IS A QUANTITATIVE APPROACH FOR DERIVING THE MINIMUM COST MODEL FOR THE INVENTORY PROBLEM IN HAND.
ECONOMIC ORDER QUANTITY (EOQ) MODEL
THIS MODEL IS APPLIED WHEN OBJECTIVE IS TO MINIMIZE THE TOTAL ANNUAL COST OF INVENTORY IN THE ORGANIZATION. ECONOMIC ORDER QUANTITY IS THAT SIZE OF THE ORDER WHICH HELPS IN ATTAINING THE ABOVE SET OBJECTIVE. EOQ MODEL IS APPLICABLE UNDER THE FOLLOWING CONDITIONS.
  • DEMAND PER YEAR IS DETERMINISTIC IN NATURE
  • PLANNING PERIOD IS ONE YEAR
  • LEAD TIME IS ZERO OR CONSTANT AND DETERMINISTIC IN NATURE
  • REPLENISHMENT OF ITEMS IS INSTANTANEOUS
  • DEMAND/CONSUMPTION RATE IS UNIFORM AND KNOWN IN ADVANCE
  • NO STOCKOUT CONDITION EXIST IN THE ORGANIZATION
THE TOTAL ANNUAL COST OF THE INVENTORY (TC) IS GIVEN BY THE FOLLOWING EQUATION IN EOQ MODEL.


EXAMPLE 1
ABC MANUFACTURERS PRODUCES 1,25,000 OIL SEALS EACH YEAR TO SATISFY THE REQUIREMENT OF THEIR CLIENT. THEY ORDER THE METAL FOR THE BUSHING IN LOT OF 30,000 UNITS. IT COST THEM $40 TO PLACE THE ORDER. THE UNIT COST OF BUSHING IS $0.12 AND THE ESTIMATED CARRYING COST IS 25% UNIT COST. FIND OUT THE ECONOMIC ORDER QUANTITY? WHAT PERCENTAGE OF INCREASES OR DECREASE IN ORDER QUANTITY IS REQUIRED SO THAT THE ORDERED QUANTITY IS ECONOMIC ORDER QUANTITY ?



ECONOMIC PRODUCTION QUANTITY (EPQ) MODEL
IN EOQ MODEL SUPPLY WAS INSTANTANEOUS, WHICH MAY NOT BE THE CASE IN ALL INDUSTRIAL APPLICATIONS. IF SUPPLY OF ITEMS IS GRADUAL TO SATISFY A CONTINUOUS DEMAND, THEN SUPPLY LINE WILL BE DEPICTED BY A SLANTED LINE.


IN THIS SITUATION, WHEN THE ORDER IS PLACED, THE SUPPLIER BEGINS PRODUCING THE UNITS AND SUPPLIES THEM CONTINUOUSLY. WHILE NEW UNITS ARE ADDED TO INVENTORY, OTHER UNITS ARE BEING USED. THUS, IF DELIVERY RATE (P) > DEMAND RATE (D), THE NET RESULT WILL BE A NET INCREASE IN THE INVENTORY LEVEL. THE SLOPE OF REPLENISHMENT LINE WILL THUS BE (P-D). SIMILLARLY THE SLOPE OF DEMAND LINE WILL BE (-D). THE AVERAGE INVENTORY CARRIED PER YEAR IS



REFERENCES :-www. nptel.iitm.ac.in

Comments

Popular posts from this blog

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 ...

Boiler Mounting - Water Level Indicator

WATER LEVEL INDICATOR Function:   It is indicates the water level inside the boiler to an observer. Working:  The water of the boiler comes into the glass tube through the lower tube and the steam through the upper tube. The water then stands in the glass tube at the same level as in the boiler. Two cocks are used to control the passage of between the boiler and the glass tube while the third cock is in used to discharge some of the water from inside the boiler to see whether the gauge is in proper order or not. The glass tube is protected by means of a cover, made of specially toughened glass, which will prevent any accident that may happen due to breaking of glass tube. It is used for ordinary boilers. Image - Water Level Indicator Figure - Water Level Indicator

Boiler Mounting - Blow off cock

BLOW OFF COCK Functions: ·         To discharge a portion of water when the boiler is in operation to blowout mud, scale or sediment periodically. ·         To empty the boiler, when necessary for cleaning, inspection & repair. ·         It is fitted on the boiler shell directly or to a short branch at the lowest part of the water space. This pipe is known as blow-down pipe. Working:   In order to operate the valve, the rectangular slot is brought in line with the passage of the body. This is possible by rotating the plug with the help of wheel. When the slot is placed in this position, the cock is opened and all the impurities, mud, sediments etc. Start flowing out of the boiler and they are removed. When the slot is brought at right angles to the passage of the body, the cock is closed. Image - Blow Off Cock Fig - Blow Off Cock...