INDUSTRIAL ENGINEERING - METHOD STUDY


INDUSTRIAL ENGINEERING
LECTURE 2


METHOD STUDY
METHOD STUDY, AIMS TO ACHIEVE THE BETTER METHOD OF DOING WORK AND FOR THIS REASON METHOD STUDY IS SOMETIMES CALLED WORK METHOD DESIGN.

DEFINITION: METHOD STUDY CAN BE DEFINED AS THE PROCEDURE FOR SYSTEMATIC RECORDING, ANALYSIS AND CRITICAL EXAMINATION OF EXISTING OR PROPOSED METHOD OF DOING WORK FOR THE PURPOSE OF DEVELOPMENT AND APPLICATION OF EASIER AND MORE EFFECTIVE METHOD.

METHOD STUDY PROCEDURE
THE FOLLOWING GENERAL STEPS DESCRIBE THE PROCEDURE FOR MAKING A METHOD STUDY.
  1. SELECT THE JOB – ON WHICH METHOD STUDY IS TO BE APPLIED.
  2. OBTAIN INFORMATION AND RECORD.
  3. EXAMINE THE INFORMATION CRITICALLY.
  4. DEVELOP THE MOST PRACTICAL, ECONOMICAL AND EFFECTIVE METHOD BY CONSIDERING REAL LIMITATIONS OF THE SITUATION.
  5. INSTALL THE NEW METHOD AS STANDARD PRACTICE.
  6. MAINTAIN THE STANDARD PRACTICE BY REGULAR FOLLOW UP.
LET US CONSIDER THESE STEPS IN SOME DETAIL.

SELECTION OF JOB FOR METHOD STUDY
PRACTICALLY, ANY ACTIVITY OR A JOB IS POTENTIAL PROJECT FOR IMPROVEMENT BUT AS THE WORK STUDY ENGINEER IS TO SELL HIS IDEAS AND MAINTAIN HIS EXISTENCE IN THE ORGANISATION, HE SHOULD ALWAYS ATTEMPT TO SELECT THOSE JOBS FOR IMPROVEMENT WHICH ARE UNPOPULAR AMONG EMPLOYEES OR ARE CONSIDERED “DIRTY” BY THEM.
BY IMPROVING SUCH JOBS, HE WOULD EARN GOODWILL FROM THE EMPLOYEES AS WELL AS THE MANAGEMENT, AND CAN EXPECT THEIR FULL COOPERATION FOR OTHER STUDIES IN THE FUTURE.
CONSIDERATIONS MAY BE GIVEN TO THE FOLLOWING FACTORS WHILE SELECTING A JOB FOR METHOD STUDY
• ECONOMIC FACTORS
• TECHNICAL FACTORS
• HUMAN FACTORS

ECONOMIC FACTORS:
IF THE ECONOMIC IMPORTANCE OF A JOB IS SMALL, IT IS NOT WISE TO START OR CONTINUE A LONG STUDY. PRIORITIES SHOULD BE GIVEN TO THOSE TYPES OF JOB WHICH OFFER GREATER POTENTIAL FOR COST REDUCTION. SUCH JOBS ARE EASILY IDENTIFIABLE, AS THEY HAVE
• HIGH LABOUR CONTENT, I.E. THEY CONSUME MORE TIME
• EXCESSIVE MACHINE OR MAN IDLENESS
• HIGHER FREQUENCY OF OCCURRENCE, I.E. THEY HAVE LARGE DEMAND
• BOTTLENECKS IN PRODUCTION LINE
• HIGHER PROPORTION OF ACCIDENTS
• MOVEMENT OF MATERIAL OR MEN OVER LONG DISTANCE
• HIGH SCRAP AND REPROCESSING COSTS
• HIGH PAYMENT OF OVERTIME BILLS.

TECHNICAL FACTORS: THE METHOD STUDY ENGINEER MUST HAVE THE NECESSARY TECHNICAL KNOWLEDGE ABOUT THE JOB TO BE STUDIED. ONLY SURFACE KNOWLEDGE ABOUT THE SUBJECT MAY NOT LEAD TO THE RIGHT SOLUTION TO THE REAL PROBLEM. TO ILLUSTRATE, CONSIDER THAT A PARTICULAR MACHINE TOOL IN PROVING BOTTLENECK. THE OUTPUT FROM THIS MACHINE IS NOT REACHING THE ASSEMBLY LINE IN THE REQUIRED QUANTITY. THROUGH A PRELIMINARY STUDY, IT IS FOUND THAT IT IS RUNNING AT LOWER SPEED AND FEED THAN THAT RECOMMENDED FOR THE PAIR OF WORK AND TOOL MATERIAL USED. JUST INCREASE IN SPEED OR FEED MAY NOT BE THE SOLUTION OF THIS PROBLEM. IT MAY BE POSSIBLE THAT THE MACHINE ITSELF IS NOT RIGID ENOUGH TO OPERATE AT HIGHER SPEEDS OR TAKE A DEEPER CUT. JUST INCREASE IN SPEED MAY INCREASE THE OUTPUT BUT THE QUALITY OF JOB MAY BE SERIOUSLY AFFECTED. TECHNICAL EXPERTISE IN MACHINE TOOLS AND METAL CUTTING PROCESS WOULD BE ESSENTIAL TO SOLVE PROBLEM OF THIS KIND.

HUMAN FACTORS: EMOTIONAL REACTION OF THE WORKERS TO THE METHOD STUDY AND CHANGES IN METHOD ARE IMPORTANT CONSIDERATIONS. IF THE STUDY OF A PARTICULAR JOB IS SUSPECTED TO CAUSE UNREST OR ILL FEELING, IT SHOULD NOT BE UNDERTAKEN, HOWEVER USEFUL IT MAY BE FROM THE ECONOMIC POINT OF VIEW. IT IS ALWAYS BETTER TO TAKE UP FIRST THOSE JOBS WHICH ARE CONSIDERED ‘DIRTY', UNSAFE, UNPLEASANT, BORING, OR HIGHLY FATIGUING, AND IMPROVEMENTS BROUGHT ABOUT AS A RESULT OF METHOD STUDY. THIS WOULD POSSIBLY ENSURE COOPERATIVE FROM THE WORKERS FOR THE OTHER JOBS AS WELL.
AFTER IT IS RECOGNIZED THAT A PROBLEM EXISTS, THE FIRST STEP IS TO PROPERLY FORMULATE IT. FROM THE GENERAL STATEMENTS LIKE “COSTS ARE TOO HIGH“, “INCREASE THE PRODUCTION”, “REDUCE SHOP FLOOR ACCIDENTS”, IT IS NECESSARY TO DETERMINE JUST WHAT THE REAL PROBLEM IS. AFTER IT IS ASCERTAINED THAT THE PROBLEM MERITS CONSIDERATION, IT IS DECIDED WHETHER THIS IS THE PROPER TIME TO SOLVE IT, AND HOW MUCH TIME CAN BE SPENT IN SOLVING IT. THE PROBLEM MAY THEN BE DEFINED BROADLY GIVING MINIMUM CONSTRAINTS AT THIS STAGE, AS IT WILL PERMIT THE USE OF IMAGINATION AND CREATIVITY IN FINDING A SOLUTION. IT MAY SOMETIMES BE DESIRABLE TO DIVIDE THE COMPLETE PROBLEM INTO A COUPLE OF SMALL PROBLEMS AND SOLVE THEM.


REFERENCES : -

1. www.nptel.iitm.ac.in

Comments

Popular posts from this blog

APRON MECHANISM IN LATHE

APRON MECHANISM IN LATHE Apron Mechanism: Apron is attached to the carriage and hangs over the front side of the lathe bed. It is useful in providing power and hand feed to both carriage and cross-slide. It is also used to provide power feed to the carriage during thread cutting through two half nuts. The construction of apron is shown in Fig. Fig - Apron Mechanism Construction Power is transmitted from the spindle to the lead screw and feed rod through the spindle gear and tumbler gear arrangement. A worm is mounted on the feed rod by a sliding key. The worm meshes with a worm gear on whose axis another gear G1 is attached. Gear G1 is attached to a small gear G2 by a bracket as shown in the diagram. Gear G4 is positioned to be in mesh with the rack gear always. Another gear G3 is mounted on the same axis of gear G4. The carriage hand wheel meant for longitudinal feed is attached to the gear G5 on the same axis. The gears G3 and G5 are always in mesh. The gear G...

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 ...

Boiler Mounting - Water Level Indicator

WATER LEVEL INDICATOR Function:   It is indicates the water level inside the boiler to an observer. Working:  The water of the boiler comes into the glass tube through the lower tube and the steam through the upper tube. The water then stands in the glass tube at the same level as in the boiler. Two cocks are used to control the passage of between the boiler and the glass tube while the third cock is in used to discharge some of the water from inside the boiler to see whether the gauge is in proper order or not. The glass tube is protected by means of a cover, made of specially toughened glass, which will prevent any accident that may happen due to breaking of glass tube. It is used for ordinary boilers. Image - Water Level Indicator Figure - Water Level Indicator