Skip to main content

IMPORTANT QUESTION OF STATISTICAL QUALITY CONTROL & RELIABILITY (MECHANICAL- 4TH YEAR)


IMPORTANT QUESTION OF STATISTICAL QUALITY CONTROL & RELIABILITY
(MECHANICAL- 4TH YEAR)


QUES 1 (A) DEFINE QUALITY AND DESCRIBE VARIOUS FACTORS AFFECTING QUALITY.                                             
              (B) WHAT IS TQM? DISCUSS ITS SCOPE AND APPLICATION IN INDIAN INDUSTRIES.                              
QUES 2(A) DEFINE QUALITY CIRCLES. DESCRIBE THEIR OBJECTIVES, STRUCTURE AND TECHNIQUES.                     
             (B) EXPLAIN THE CONCEPT OF FISH BONE DIAGRAM                                                                                
QUES 3 (A) EXPLAIN BASIC STATISTICAL CONCEPT? WHAT ARE THE VARIOUS TYPES OF DISTRIBUTION?                 
              (B) WHAT ARE CONTROL CHARTS AND EXPLAIN ITS OBJECTIVES.                                                              
QUES 4   A SUBGROUP OF 5 ITEMS EACH ARE TAKEN FROM A MANUFACTURING PROCESS AT A REGULAR INTERVAL. A CERTAIN QUALITY CHARACTERISTICS IS MEASURED AND  X AND R  VALUES COMPUTED . AFTER 25 SUBGROUPS IT IS FOUND THAT ∑X=357.50 AND ∑ R =8.80. IF THE SPECIFICATIONS LIMIT ARE 14.40 ±0.40  , AND IF THE PROCESS IS IN STATISTICAL CONTROL , WHAT CONCLUSION CAN YOU DRAW ABOUT THE ABILITY OF THE PROCESS TO PRODUCE ITEM WITH SPECIFICATIONS  ? (D₂ = 2.326).                                                                                                                         
QUES 5 WRITE A BRIEF NOTE ON
(a)  PROCESS CAPABILITY
(b)  DEFECTS  AND DEFECTIVES                                                                                                                   
QUES 6 DEFINE SAMPLING. WHY IT IS NEEDED? DRAW AN OC CURVE AND DESCRIBE CONSUMER AND PRODUCERS    RISK.                                                                                                                                                                   
QUES7 EXPLAIN SINGLE AND DOUBLE SAMPLING PLAN.                                                                                   

Comments

  1. Trimaster Metrology Services Trimaster Metrology are into marketing, sales, training, servicing & calibration of “Metrology, Quality testing, Measuring instruments & software solutions” for varied industries.
    About us 400+ AMC Contracts 2500+ Active Customers 10 OEM Partners 10 Regional Offices (Sales & Service) 6 Year Old Entity 35 Team Strength Our presence across the country enables us to pioneer enhanced reach and customer support.

    ReplyDelete

Post a Comment

Popular posts from this blog

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 ...

Boiler Mounting - Water Level Indicator

WATER LEVEL INDICATOR Function:   It is indicates the water level inside the boiler to an observer. Working:  The water of the boiler comes into the glass tube through the lower tube and the steam through the upper tube. The water then stands in the glass tube at the same level as in the boiler. Two cocks are used to control the passage of between the boiler and the glass tube while the third cock is in used to discharge some of the water from inside the boiler to see whether the gauge is in proper order or not. The glass tube is protected by means of a cover, made of specially toughened glass, which will prevent any accident that may happen due to breaking of glass tube. It is used for ordinary boilers. Image - Water Level Indicator Figure - Water Level Indicator

Boiler Mounting - Blow off cock

BLOW OFF COCK Functions: ·         To discharge a portion of water when the boiler is in operation to blowout mud, scale or sediment periodically. ·         To empty the boiler, when necessary for cleaning, inspection & repair. ·         It is fitted on the boiler shell directly or to a short branch at the lowest part of the water space. This pipe is known as blow-down pipe. Working:   In order to operate the valve, the rectangular slot is brought in line with the passage of the body. This is possible by rotating the plug with the help of wheel. When the slot is placed in this position, the cock is opened and all the impurities, mud, sediments etc. Start flowing out of the boiler and they are removed. When the slot is brought at right angles to the passage of the body, the cock is closed. Image - Blow Off Cock Fig - Blow Off Cock...