Skip to main content

TRAINING REPORT FORMAT




SPECIFICATIONS FOR TRAINING REPORT

  1. The report shall be computer typed (English-, Font –Times New Roman, text Size-12 point, Heading -14 with bold & sub heading -14 without bold) and printed on A4 size paper.
  2. The report shall be Spiral bound with cover page. The printing should be single sided only.
  3. The report shall be typed on one side only with
§  1.5 spaces with a margin 1.5” on the left & 1”on all others.
§  The indenting should be justified (no tab indenting for new paragraph).
§  There should be double line spacing for gap b/w paragraphs.
§  Chapter subheading numbering e.g.: 1.1 or 2.1 etc.
§  There should be Separator sheets between the chapters mentioning chapter no. & the title & should also carry one transparency with each separator sheet.
  1. In the report, there should be following sequence of pages:
                                                       I.            The title page [Refer sample sheet (inner cover)]
                                                    II.            The Certificate. It should be colored in printing on A4 size paper.
                                                 III.            Acknowledgment; duly signed by student itself.
                                                 IV.            About Company/industry/institute.
                                                    V.            List of figures
                                                 VI.            List of tables
                                              VII.            Notations/nomenclature (if any)
                                           VIII.            Contents with title & subtitle, page no.
                                                 IX.            The report must consist of following chapters
§  Chapter 1- Introduction
§  Chapter 2- Project work (It can span in two or three subchapters depending on type & volume of work. This contains the text & related to hardware & software implementation)
§  Chapter 3- Results and Discussion
§  Chapter 4  Conclusions and future scope

                                                    X.            References (The references must be at the end of the report in alphabetical order indicating:
                                                                                  i.             The name of book and publisher
                                                                                ii.            The title of paper & the name of journal
                                                 XI.            Data sheet (if any)
                                              XII.            Appendix (if any)
5.      The diagrams should be printed on a light/white background; Tabular matter should be clearly arranged, with proper numbering as Fig 1.1 or 2.1 etc. Decimal point may be indicated by full stop (.). The caption for Figure must be given at the BOTTOM of the Fig. and Caption for the Table must be given at the TOP of the Table.
6.      Page Numbering should be in center bottom (certificate, acknowledgment, list of figures, list of tables, Notations/nomenclature & contents should be numbered in lower Roman); No numbering for separator sheets. Data sheets and Appendices should also be numbered in lower Roman but not in succession to the aforesaid numbering. It should start from (i) onwards.





 Chairperson                                                                                      Co-ordinator
                                                                                   































SAMPLE FORMAT




INDUSTRIAL TRAINING REPORT (14 BOLD)
ON
TITLE (22 BOLD)


  SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR THE AWARD OF THE DEGREE OF (12pt.)


BACHELOR OF TECHNOLOGY (14 BOLD)
(Mechanical Engineering) (14 BOLD)

 AT
INDUSTRY/INSTITUTE NAME (14 BOLD)

 

SUBMITTED BY (12 pt.)

NAME (14 BOLD)
ROLL NO. (14 BOLD)

SUBMITTED TO (12 pt.)
Er. XYZ
Chairperson-ME Dept.
Er. ABC
Incharge- Training Viva-Voce


COLLEGE LOGO 


SESSION 2011-2012(14 BOLD)

Department of Mechanical Engineering (14 pt)

 COLLEGE NAME
       (Affiliated by XYZ University) (14 pt)
PLACE-PIN CODE (20 BOLD)

Comments

Popular posts from this blog

APRON MECHANISM IN LATHE

APRON MECHANISM IN LATHE Apron Mechanism: Apron is attached to the carriage and hangs over the front side of the lathe bed. It is useful in providing power and hand feed to both carriage and cross-slide. It is also used to provide power feed to the carriage during thread cutting through two half nuts. The construction of apron is shown in Fig. Fig - Apron Mechanism Construction Power is transmitted from the spindle to the lead screw and feed rod through the spindle gear and tumbler gear arrangement. A worm is mounted on the feed rod by a sliding key. The worm meshes with a worm gear on whose axis another gear G1 is attached. Gear G1 is attached to a small gear G2 by a bracket as shown in the diagram. Gear G4 is positioned to be in mesh with the rack gear always. Another gear G3 is mounted on the same axis of gear G4. The carriage hand wheel meant for longitudinal feed is attached to the gear G5 on the same axis. The gears G3 and G5 are always in mesh. The gear G...

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 ...

Boiler Mounting - Water Level Indicator

WATER LEVEL INDICATOR Function:   It is indicates the water level inside the boiler to an observer. Working:  The water of the boiler comes into the glass tube through the lower tube and the steam through the upper tube. The water then stands in the glass tube at the same level as in the boiler. Two cocks are used to control the passage of between the boiler and the glass tube while the third cock is in used to discharge some of the water from inside the boiler to see whether the gauge is in proper order or not. The glass tube is protected by means of a cover, made of specially toughened glass, which will prevent any accident that may happen due to breaking of glass tube. It is used for ordinary boilers. Image - Water Level Indicator Figure - Water Level Indicator