TPM – AN INTRODUCTION

TPM – AN INTRODUCTION

WHAT IS TPM:
TPM MEANS TOTAL PRODUCTIVE MAINTENANCE, THE WORD TOTAL IN TOTAL PRODUCTIVE MAINTENANCE HAS THREE MEANINGS: -

TOTAL EFFECTIVENESS INDICATES TPM’S PURSUIT OF ECONOMIC EFFICIENCY OR PROFITABILITY.

TOTAL MAINTENANCE SYSTEM INCLUDES MAINTENANCE PREVENTION AND CORRECTIVE MAINTENANCE AS WELL AS PREVENTIVE MAINTENANCE.

TOTAL PARTICIPATION OF ALL EMPLOYEES INCLUDES DESIGN, ENGINEERING, PERSONNEL, OPERATIONS, MAINTENANCE ETC.  THIS ALSO INCLUDES AUTONOMOUS MAINTENANCE BY OPERATORS.
AS IT’S NAME IMPLIES TPM MEANS INCREASE IN PRODUCTIVITY & PRODUCTIVITY CAN BE INCREASED BY

·         UPGRADING QUALITY–   MAKE FIRST TIME RIGHT
·         MAKE FIRST   TIME   RIGHT THAN ONLY COST WILL COME DOWN.
·         MAINTAIN = DELIVERY – AS PER CUSTOMER REQUIREMENT
·         UPGRADE SAFETY –   TO THE   USER / EMPLOYEE / CUSTOMER

·         MORALE –   HIGH MORALE (WE HAVE TO WIN WHERE ARE NOT MEANT FOR LOOSER’S)


 For complete details & PDF of the TPM - An Introduction ---- Click Here

Comments

  1. Awesome article sir. I need your help for preparing for job interview

    ReplyDelete

Post a Comment

Popular posts from this blog

MANUFACTURING PROCESS - DRAFT OR TAPER ALLOWANCE

DRAFT OR TAPER ALLOWANCE BY DRAFT IS MEANT THE TAPER PROVIDED BY THE PATTERN MAKER ON ALL VERTICAL SURFACES OF THE PATTERN SO THAT IT CAN BE REMOVED FROM THE SAND WITHOUT TEARING AWAY THE SIDES OF THE SAND MOLD AND WITHOUT EXCESSIVE RAPPING BY THE MOLDER. FIGURE  SHOWS A PATTERN HAVING NO DRAFT ALLOWANCE BEING REMOVED FROM THE PATTERN. IN THIS CASE, TILL THE PATTERN IS COMPLETELY LIFTED OUT, ITS SIDES WILL REMAIN IN CONTACT WITH THE WALLS OF THE MOLD, THUS TENDING TO BREAK IT.  FIGURE  IS AN ILLUSTRATION OF A PATTERN HAVING PROPER DRAFT ALLOWANCE. HERE, THE MOMENT THE PATTERN LIFTING COMMENCES, ALL OF ITS SURFACES ARE WELL AWAY FROM THE SAND SURFACE. THUS THE PATTERN CAN BE REMOVED WITHOUT DAMAGING THE MOLD CAVITY.  PATTERN HAVING DRAFT ON VERTICAL EDGES DRAFT ALLOWANCE VARIES WITH THE COMPLEXITY OF THE SAND JOB. BUT IN GENERAL INNER DETAILS OF THE PATTERN REQUIRE HIGHER DRAFT THAN OUTER SURFACES. THE AMOUNT OF DRAFT DEPENDS UPON THE LENGTH OF THE...

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 ...

Boiler Mounting - Water Level Indicator

WATER LEVEL INDICATOR Function:   It is indicates the water level inside the boiler to an observer. Working:  The water of the boiler comes into the glass tube through the lower tube and the steam through the upper tube. The water then stands in the glass tube at the same level as in the boiler. Two cocks are used to control the passage of between the boiler and the glass tube while the third cock is in used to discharge some of the water from inside the boiler to see whether the gauge is in proper order or not. The glass tube is protected by means of a cover, made of specially toughened glass, which will prevent any accident that may happen due to breaking of glass tube. It is used for ordinary boilers. Image - Water Level Indicator Figure - Water Level Indicator