THERMODYNAMICS IS THE STUDY OF ENERGY INTERACTIONS BETWEEN SYSTEMS AND THE EFFECT OF THESE INTERACTIONS ON THE SYSTEM PROPERTIES. ENERGY TRANSFER BETWEEN SYSTEMS TAKES PLACE IN THE FORM OF HEAT AND/OR WORK. THERMODYNAMICS DEALS WITH SYSTEMS IN EQUILIBRIUM.

A THERMODYNAMIC SYSTEM IS DEFINED AS A QUANTITY OF MATTER OF FIXED MASS AND IDENTITY UPON WHICH ATTENTION IS FOCUSED FOR STUDY. IN SIMPLE TERMS, A SYSTEM IS WHATEVER WE WANT TO STUDY. A SYSTEM COULD BE AS SIMPLE AS A GAS IN A CYLINDER OR AS COMPLEX AS A NUCLEAR POWER PLANT. EVERYTHING EXTERNAL TO THE SYSTEM IS THE SURROUNDINGS. THE SYSTEM IS SEPARATED FROM THE SURROUNDINGS BY THE SYSTEM BOUNDARIES. THERMODYNAMIC SYSTEMS CAN BE FURTHER CLASSIFIED INTO CLOSED SYSTEMS, OPEN SYSTEMS AND ISOLATED SYSTEMS.
A CONTROL VOLUME, WHICH MAY BE CONSIDERED AS AN OPEN SYSTEM, IS DEFINED AS A SPECIFIED REGION IN SPACE UPON WHICH ATTENTION IS FOCUSED. THE CONTROL VOLUME IS SEPARATED FROM THE SURROUNDINGS BY A CONTROL SURFACE. BOTH MASS AND ENERGY CAN ENTER OR LEAVE THE CONTROL VOLUME.

THE FIRST AND AN EXTREMELY IMPORTANT STEP IN THE STUDY OF THERMODYNAMICS IS TO CHOOSE AND IDENTIFY THE SYSTEM PROPERLY AND SHOW THE SYSTEM BOUNDARIES CLEARLY.

A PROCESS IS DEFINED AS THE PATH OF THERMODYNAMIC STATES WHICH THE SYSTEM PASSES THROUGH AS IT GOES FROM AN INITIAL STATE TO A FINAL STATE. 
IN REFRIGERATION AND AIR CONDITIONING ONE ENCOUNTERS A WIDE VARIETY OF PROCESSES. UNDERSTANDING THE NATURE OF THE PROCESS PATH IS VERY IMPORTANT AS HEAT AND WORK DEPEND ON THE PATH.
A SYSTEM IS SAID TO HAVE UNDERGONE A CYCLE IF BEGINNING WITH AN INITIAL STATE IT GOES THROUGH DIFFERENT PROCESSES AND FINALLY ARRIVES AT THE INITIAL STATE.


Comments

Popular posts from this blog

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 ...

Boiler Mounting - Water Level Indicator

WATER LEVEL INDICATOR Function:   It is indicates the water level inside the boiler to an observer. Working:  The water of the boiler comes into the glass tube through the lower tube and the steam through the upper tube. The water then stands in the glass tube at the same level as in the boiler. Two cocks are used to control the passage of between the boiler and the glass tube while the third cock is in used to discharge some of the water from inside the boiler to see whether the gauge is in proper order or not. The glass tube is protected by means of a cover, made of specially toughened glass, which will prevent any accident that may happen due to breaking of glass tube. It is used for ordinary boilers. Image - Water Level Indicator Figure - Water Level Indicator

Boiler Mounting - Blow off cock

BLOW OFF COCK Functions: ·         To discharge a portion of water when the boiler is in operation to blowout mud, scale or sediment periodically. ·         To empty the boiler, when necessary for cleaning, inspection & repair. ·         It is fitted on the boiler shell directly or to a short branch at the lowest part of the water space. This pipe is known as blow-down pipe. Working:   In order to operate the valve, the rectangular slot is brought in line with the passage of the body. This is possible by rotating the plug with the help of wheel. When the slot is placed in this position, the cock is opened and all the impurities, mud, sediments etc. Start flowing out of the boiler and they are removed. When the slot is brought at right angles to the passage of the body, the cock is closed. Image - Blow Off Cock Fig - Blow Off Cock...