Skip to main content

TRAINING REPORT FORMAT - B-TECH


SPECIFICATIONS FOR TRAINING REPORT

1.     THE REPORT SHALL BE COMPUTER TYPED (ENGLISH-, FONT –TIMES NEW ROMAN, TEXT SIZE-12 POINT, HEADING -14 WITH BOLD & SUB HEADING -14 WITHOUT BOLD) AND PRINTED ON A4 SIZE PAPER.
2.     THE REPORT SHALL BE SPIRAL BOUND WITH COVER PAGE. THE PRINTING SHOULD BE SINGLE SIDED ONLY.
3.     THE REPORT SHALL BE TYPED ON ONE SIDE ONLY WITH

  • 1.5 SPACES WITH A MARGIN 1.5” ON THE LEFT & 1”ON ALL OTHERS. 
  • THE INDENTING SHOULD BE JUSTIFIED (NO TAB INDENTING FOR NEW PARAGRAPH).
  • THERE SHOULD BE DOUBLE LINE SPACING FOR GAP B/W PARAGRAPHS.
  • CHAPTER SUBHEADING NUMBERING E.G.: 1.1 OR 2.1 ETC.
  • THERE SHOULD BE SEPARATOR SHEETS BETWEEN THE CHAPTERS MENTIONING CHAPTER NO. & THE TITLE & SHOULD ALSO CARRY ONE TRANSPARENCY WITH EACH SEPARATOR SHEET.
4.     IN THE REPORT, THERE SHOULD BE FOLLOWING SEQUENCE OF PAGES:


  • THE TITLE PAGE [REFER SAMPLE SHEET (INNER COVER)
  • THE CERTIFICATE. IT SHOULD BE COLORED IN PRINTING ON A4     SIZE PAPER.
  • ACKNOWLEDGEMENT; DULY SIGNED BY STUDENT ITSELF.
  •  ABOUT COMPANY/INDUSTRY/INSTITUTE.
  • LIST OF FIGURES
  • LIST OF TABLES
  • NOTATIONS/NOMENCLATURE (IF ANY)
  • CONTENTS WITH TITLE & SUBTITLE, PAGE NO.
  • THE REPORT MUST CONSIST OF FOLLOWING CHAPTERS

  1. CHAPTER 1- INTRODUCTION
  2. CHAPTER 2- PROJECT WORK (IT CAN SPAN IN TWO OR THREE SUB CHAPTERS DEPENDING ON TYPE & VOLUME OF WORK. THIS CONTAINS THE TEXT & RELATED TO HARDWARE & SOFTWARE IMPLEMENTATION)
  3. CHAPTER 3- RESULTS AND DISCUSSION
  4. CHAPTER 4  CONCLUSIONS AND FUTURE SCOPE
  • REFERENCES (THE REFERENCES MUST BE AT THE END OF THE REPORT IN ALPHABETICAL ORDER INDICATING:
  1.  THE NAME OF BOOK AND PUBLISHER
  1. THE TITLE OF PAPER & THE NAME OF JOURNAL
  1. DATA SHEET (IF ANY)
  1. APPENDIX (IF ANY)
  1. THE DIAGRAMS SHOULD BE PRINTED ON A LIGHT/WHITE BACKGROUND; TABULAR MATTER SHOULD BE CLEARLY ARRANGED, WITH PROPER NUMBERING AS FIG 1.1 OR 2.1 ETC. DECIMAL POINT MAY BE INDICATED BY FULL STOP (.). THE CAPTION FOR FIGURE MUST BE GIVEN AT THE BOTTOM OF THE FIG. AND CAPTION FOR THE TABLE MUST BE GIVEN AT THE TOP OF THE TABLE.
  1. PAGE NUMBERING SHOULD BE IN CENTER BOTTOM (CERTIFICATE, ACKNOWLEDGEMENT, LIST OF FIGURES, LIST OF TABLES, NOTATIONS/NOMENCLATURE & CONTENTS SHOULD BE NUMBERED IN LOWER ROMAN); NO NUMBERING FOR SEPARATOR SHEETS. DATA SHEETS AND APPENDICES SHOULD ALSO BE NUMBERED IN LOWER ROMAN BUT NOT IN SUCCESSION TO THE AFORESAID NUMBERING. IT SHOULD START FROM (I) ONWARDS.


















 CHAIRPERSON                                                                     CO-ORDINATOR
















SAMPLE FORMAT


INDUSTRIAL TRAINING REPORT (14 BOLD)

ON

TITLE (22 BOLD)

  SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR THE AWARD OF THE DEGREE OF (12PT.)


BACHELOR OF TECHNOLOGY (14 BOLD)

(MECHANICAL ENGINEERING) (14 BOLD)


 AT


INDUSTRY/INSTITUTE NAME (14 BOLD)


SUBMITTED BY (12 PT.)                                          SUBMITTED TO (12 PT.)

NAME (14 BOLD)                                                       ER. XYZ

ROLL NO. (14 BOLD)                                              CHAIRPERSON-ME  DEPT.                                                                                      
                                                        ER. ABC
                                                                                    INCHARGE- TRAINING
                                                               VIVA-VOCE



COLLEGE LOGO 

SESSION 2011-2012(14 BOLD)

DEPARTMENT OF MECHANICAL ENGINEERING (14 PT)


 COLLEGE NAME

       (AFFILIATED BY XYZ UNIVERSITY) (14 PT)

PLACE-PIN CODE (20 BOLD)

Comments

  1. Visionics, Technopark, Trivandrum provide implant training and internship Training to B.Tech/ BE freshers and students. Log onto www.visionics.co.in for more details.

    ReplyDelete
    Replies
    1. Hi, Great.. Tutorial is just awesome..It is really helpful for a newbie like me.. I am a regular follower of your blog. Really very informative post you shared here. Kindly keep blogging. If anyone wants to become a Front end developer learn from Javascript Training in Chennai . or learn thru JavaScript Online Training India. Nowadays JavaScript has tons of job opportunities on various vertical industry.

      Delete

  2. Great blog.I got to learn about this easily.You're really improving.

    Thank you,
    Venkatesan Prabu.J
    KaaShiv InfoTech

    http://kaashivinfotech.com/
    http://inplanttrainingchennai..com/
    http://inplanttraining-in-chennai.com/
    http://internshipinchennai.in/
    http://inplant-training.org/

    http://kaashivinfotech.com.

    http://inplanttrainingchennai.com.

    http://inplanttraining-in-chennai.com.

    http://internshipinchennai.in.

    http://inplant-training.org.

    ReplyDelete
  3. This is the great information. I will really join it.. Six months industrial training in chandigarh in one of the following languages: PHP, Web-Designing, JAVA, .Net, Android, Graphic Designing SEO, SEM, SMM and much more.

    ReplyDelete

Post a Comment

Popular posts from this blog

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 ...

Boiler Mounting - Water Level Indicator

WATER LEVEL INDICATOR Function:   It is indicates the water level inside the boiler to an observer. Working:  The water of the boiler comes into the glass tube through the lower tube and the steam through the upper tube. The water then stands in the glass tube at the same level as in the boiler. Two cocks are used to control the passage of between the boiler and the glass tube while the third cock is in used to discharge some of the water from inside the boiler to see whether the gauge is in proper order or not. The glass tube is protected by means of a cover, made of specially toughened glass, which will prevent any accident that may happen due to breaking of glass tube. It is used for ordinary boilers. Image - Water Level Indicator Figure - Water Level Indicator

Boiler Mounting - Blow off cock

BLOW OFF COCK Functions: ·         To discharge a portion of water when the boiler is in operation to blowout mud, scale or sediment periodically. ·         To empty the boiler, when necessary for cleaning, inspection & repair. ·         It is fitted on the boiler shell directly or to a short branch at the lowest part of the water space. This pipe is known as blow-down pipe. Working:   In order to operate the valve, the rectangular slot is brought in line with the passage of the body. This is possible by rotating the plug with the help of wheel. When the slot is placed in this position, the cock is opened and all the impurities, mud, sediments etc. Start flowing out of the boiler and they are removed. When the slot is brought at right angles to the passage of the body, the cock is closed. Image - Blow Off Cock Fig - Blow Off Cock...