Skip to main content

PROJECT REPORT FORMAT


Name of project (20 pt.)

                                                    A

Minor Project (14pt.)

                                           -----------------------------------------------------------------------------

SUBMITTED IN PARTIAL FULFILLMENT

FOR THE AWARD OF THE

DEGREE OF (12PT.)

BACHELOR OF TECHNOLOGY (14PT.)

IN (12pt.)

MECHANICAL ENGINEERING (14pt.)

Submitted by (12pt.)

Name of student (12pt.)                         Roll No. (12pt.)

Under the guidance of (12pt.)

Name of Guide (12pt.)

                                                                        college logo

(2006-2010) (14pt.)

college name (20pt.)

place (20pt.)

(Kurukshetra University, Kurukshetra) (14pt.)



NOTICE

MECHANICAL ENGG. DEPSARTMENT

FORMAT FOR PROJECT REPORT

1.         No. of pages                                                50 to 80 (Text Material only)

2.         Font size                                                     Chapter Heading & Title (Bold)(18pt.)

                                                                                 Main Heading (Bold, 16pt.)

                                 Sub heading (bold), 14pt.

                                                                                 Text (no underline, 12pt.)

3.         Font Style                                                    Times New Roman

4.         Cover Page                                                  In proper and in given format

5.    Sequences of pages

·        Cover page

·        Certificate

·        Acknowledgement (Duly signed by the student itself & Guide)

·        List of figures

·        List of tables

·        Notations / Nomenclatures (if any)

·        Contents (with title & sub title name, number and page number)

·        Chapters (The chapter should be in the given sequence)

               Chapter 1 – Introduction

               Chapter 2 – Literature Review

               Chapter 3 – Conclusions and future scope


·        References (The Reference should be given at the end of the report  in alphabetical order               indicating :

        i.            The author name

       ii.            The title of the paper and name of journal

      iii.            The name of the book and the publisher

      iv.            The number of the volume, page numbers, and the year of publication

      v.             Standard abbreviation may be used in the name of the journals

 

For Example:

1)    Singh, S. and Shan, H.S. (2002) “Development of Magneto Abrasive flow Machining Process” International journal of Machine Tools & Manufacturing. Vol...42, 2, 2002, pp.953-959

2)    Sharma, P.C. (2006),”A Text Book of Production Technology”, S.Chand & Company Ltd., New Delhi).


 ·        Appendix (if any)

6.  Page Numbering Center bottom (certificate, Acknowledge, List of Figures, List of tables, Notations/nomenclatures and Contents should numbered in lower roman); No Numbering for separator sheets. Appendices should also be numbered in lower roman but not in succession to above mentioned page numbering. It should start from onward.

7.  Diagram/Figure/Tables :-

Decent coverage of the page as per image requirement with proper numbering e.g. fig. 1.1, 2.1 etc. (The caption for Diagram/Figure Must be given at the BOTTOM of the Diagram / Figure and caption for the  table must  be given at the TOP of the table).

8.      Line spacing                       1.5

9.     Page Margins                      left – 1.5”

                                                     Right, Top & bottom – 1”

10.     Indenting                           Justified (no tab indenting for new paragraphs)

11.     Gap b/w paragraphs          Double line spacing

12.     Printing                              Single side only

13.     Binding                              Hard Leather Bound

14.     Chapter sub heading numbering e.g. 1.1, 2.1.1 etc.

15.     No blanks on the pages accept at the end of the chapter.

16.    Separator sheet b/w chapters mentioning chapter no. & title (colored sheet) and should also carry one transparency with each separator sheet.

17.   Reports should be Leather Bound with Black Base and Golden Print on it, otherwise it will be not accepted at any cost.

 

Er.a.b.c.

H.O.D, (MECH. ENGG.)

Comments

Popular posts from this blog

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 ...

Boiler Mounting - Water Level Indicator

WATER LEVEL INDICATOR Function:   It is indicates the water level inside the boiler to an observer. Working:  The water of the boiler comes into the glass tube through the lower tube and the steam through the upper tube. The water then stands in the glass tube at the same level as in the boiler. Two cocks are used to control the passage of between the boiler and the glass tube while the third cock is in used to discharge some of the water from inside the boiler to see whether the gauge is in proper order or not. The glass tube is protected by means of a cover, made of specially toughened glass, which will prevent any accident that may happen due to breaking of glass tube. It is used for ordinary boilers. Image - Water Level Indicator Figure - Water Level Indicator

Boiler Mounting - Blow off cock

BLOW OFF COCK Functions: ·         To discharge a portion of water when the boiler is in operation to blowout mud, scale or sediment periodically. ·         To empty the boiler, when necessary for cleaning, inspection & repair. ·         It is fitted on the boiler shell directly or to a short branch at the lowest part of the water space. This pipe is known as blow-down pipe. Working:   In order to operate the valve, the rectangular slot is brought in line with the passage of the body. This is possible by rotating the plug with the help of wheel. When the slot is placed in this position, the cock is opened and all the impurities, mud, sediments etc. Start flowing out of the boiler and they are removed. When the slot is brought at right angles to the passage of the body, the cock is closed. Image - Blow Off Cock Fig - Blow Off Cock...