Skip to main content

SYLLABUS SIXTH SEMESTER/KURUKSHETRA UNIVERSITY - MECHANICAL VIBRATION

SYLLABUS SIXTH SEMESTER - MECHANICAL VIBRATION
KURUKSHETRA UNIVERSITY

B. Tech (Sixth semester) Mechanical engineering
ME 306 E MECHANICAL VIBRATION
Total Theory: 100 Marks         Sessional: 50 marks    Duration of Exam: 03 hours

UNIT I
Kinematics of simple vibrating motion, Simple harmonic motions, Vectorial representation of harmonic motion. Degree of freedom, Equations of motions, general solution of free vibration, Phase plane method

UNIT II
Damped free vibration, undamped and damped forced vibrations, Vibrating isolation, Vibrating instruments.
Undamped free vibration, Principle modes, Influence coefficients, Coordinate coupling, Orthogonality, Vibration absorbers.

UNIT III
Geometric method, Stability of equilibrium points, Method of harmonic balance.
Influence coefficients, Dunkerleys equation, Matrix iteration, Holzer method, Rayleigh method, and Rayleigh-Ritz method.

UNIT IV
Transverse vibration of strings, longitudinal vibrations of bars, Lateral vibration of beams, Torsional vibration of circular shafts, whirling of shafts.
Introduction, Method of Laplace transformation and response to an impulsive output, response to step-input, pulse-input, and phase plane method.

REFERENCE AND TEXT BOOKS: 
-
·         Mechanical vibration - By G.K. Grover; Nemchand Chand and Sons
·         Mechanical Vibration – By Thomson; Prentice Hall
·         Mechanical Vibration - By Den Hartog; Mc Graw Hill
·         Introductory course to mechanical vibrations – By Rao and Gupta; Wiley Eastern

NOTE: In the semester examination, the examiner will set 8 questions in all, at least two question from each unit, and students will be required to attempt only 5 questions, at least one from each unit.


Comments

Popular posts from this blog

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 ...

Boiler Mounting - Water Level Indicator

WATER LEVEL INDICATOR Function:   It is indicates the water level inside the boiler to an observer. Working:  The water of the boiler comes into the glass tube through the lower tube and the steam through the upper tube. The water then stands in the glass tube at the same level as in the boiler. Two cocks are used to control the passage of between the boiler and the glass tube while the third cock is in used to discharge some of the water from inside the boiler to see whether the gauge is in proper order or not. The glass tube is protected by means of a cover, made of specially toughened glass, which will prevent any accident that may happen due to breaking of glass tube. It is used for ordinary boilers. Image - Water Level Indicator Figure - Water Level Indicator

Boiler Mounting - Blow off cock

BLOW OFF COCK Functions: ·         To discharge a portion of water when the boiler is in operation to blowout mud, scale or sediment periodically. ·         To empty the boiler, when necessary for cleaning, inspection & repair. ·         It is fitted on the boiler shell directly or to a short branch at the lowest part of the water space. This pipe is known as blow-down pipe. Working:   In order to operate the valve, the rectangular slot is brought in line with the passage of the body. This is possible by rotating the plug with the help of wheel. When the slot is placed in this position, the cock is opened and all the impurities, mud, sediments etc. Start flowing out of the boiler and they are removed. When the slot is brought at right angles to the passage of the body, the cock is closed. Image - Blow Off Cock Fig - Blow Off Cock...