INDUSTRIAL ENGINEERING - WORK STUDY


INDUSTRIAL ENGINEERING
LECTURE - 1


WORK STUDY
DEFINITION: WORK STUDY MAY BE DEFINED AS THE ANALYSIS OF A JOB FOR THE PURPOSE OF FINDING THE PREFERRED METHOD OF DOING IT AND ALSO DETERMINING THE STANDARD TIME TO PERFORM IT BY THE PREFERRED (OR GIVEN) METHOD. WORK STUDY, THEREFORE, COMPRISES OF TWO AREAS OF STUDY: METHOD STUDY (MOTION STUDY) AND TIME STUDY (WORK MEASUREMENT).

ROLE OF WORK STUDY IN IMPROVING PRODUCTIVITY
IN ORDER TO UNDERSTAND THE ROLE OF WORK STUDY, WE NEED TO UNDERSTAND THE ROLE OF METHOD STUDY AND THAT OF TIME STUDY.
METHOD STUDY (ALSO SOMETIMES CALLED WORK METHOD DESIGN) IS MOSTLY USED TO IMPROVE THE METHOD OF DOING WORK. IT IS EQUALLY APPLICABLE TO NEW JOBS. WHEN APPLIED TO EXISTING JOBS AND EXISTING JOBS, METHOD STUDY AIMS TO FIND BETTER METHODS OF DOING THE JOBS THAT ARE ECONOMICAL AND SAFE, REQUIRE LESS HUMAN EFFORT, AND NEED SHORTER MAKE-READY / PUT-AWAY TIME. THE BETTER METHOD INVOLVES THE OPTIMUM USE OF BEST MATERIALS AND APPROPRIATE MANPOWER SO THAT WORK IS PERFORMED IN WELL ORGANIZED MANNER LEADING TO INCREASED RESOURCE UTILIZATION, BETTER QUALITY AND LOWER COSTS.
IT CAN THEREFORE BE STATED THAT THROUGH METHOD STUDY WE HAVE A SYSTEMATIC WAY OF DEVELOPING HUMAN RESOURCE EFFECTIVENESS, PROVIDING HIGH MACHINE AND EQUIPMENT UTILIZATION, AND MAKING ECONOMICAL USE OF MATERIALS.
TIME STUDY, ON THE OTHER HAND, PROVIDES THE STANDARD TIME, THAT IS THE TIME NEEDED BY WORKER TO COMPLETE A JOB BY THE STANDARD METHOD. STANDARD TIMES FOR DIFFERENT JOBS ARE NECESSARY FOR PROPER ESTIMATION OF
  • MANPOWER, MACHINERY AND EQUIPMENT REQUIREMENTS
  • DAILY, WEEKLY OR MONTHLY REQUIREMENT OF MATERIALS
  • PRODUCTION COST PER UNIT AS AN INPUT TO BETTER MAKE OR BUY DECISION
  • LABOR BUDGETS
  • WORKER'S EFFICIENCY AND MAKE INCENTIVE WAGE PAYMENTS.
BY THE APPLICATION OF METHOD STUDY AND TIME STUDY IN ANY ORGANIZATION, WE CAN THUS ACHIEVE GREATER OUTPUT AT LESS COST AND OF BETTER QUALITY, AND HENCE ACHIEVE HIGHER PRODUCTIVITY.

WORK STUDY AND ERGONOMICS
THE WORK STUDY AND THE ERGONOMICS ARE THE TWO AREAS OF STUDY HAVING THE SAME OBJECTIVE: DESIGN THE WORK SYSTEM SO THAT FOR THE OPERATOR IT IS SAFE, AND THE WORK IS LESS FATIGUING AND LESS TIME TAKING.

HISTORICAL DEVELOPMENTS
THE WORK OF TAYLOR
FREDERICK W. TAYLOR IS GENERALLY CONSIDERED TO BE THE FOUNDER OF MODERN METHOD AND TIME STUDY, ALTHOUGH TIME STUDIES WERE CONDUCTED IN EUROPE MANY YEARS BEFORE TAYLOR 'S TIME. IN 1760, JEAN RODOLPHE PERRONET, A FRENCH ENGINEER, MADE EXTENSIVE TIME STUDIES ON THE MANUFACTURE OF NO. 6 COMMON PINS.
TAYLOR BEGAN HIS TIME STUDY WORK IN 1881 WHILE ASSOCIATED WITH THE MIDVALE STEEL COMPANY IN U.S.A.. HE EVOLVED A SYSTEM BASED ON THE “TASK”, AND PROPOSED THAT THE WORK OF EACH EMPLOYEE BE PLANNED OUT BY THE MANAGEMENT IN ADVANCE. EACH JOB WAS TO HAVE A STANDARD TIME, DETER­ MINED BY TIME STUDIES MADE BY EXPERTS. IN THE TIMING PROCESS, TAYLOR ADVOCATED DIVIDING THE WORK INTO SMALL DIVISIONS OF EFFORT KNOWN AS "ELE MENTS." EXPERTS WERE TO TIME THESE INDIVIDUALLY AND USE THEIR COLLECTIVE VALUES TO DETERMINE THE ALLOWED TIME FOR THE TASK.
EARLY PRESENTATIONS OF TAYLOR 'S FINDINGS WERE RECEIVED WITH LITTLE ENTHUSIASM, BECAUSE MANY INTERPRETED HIS FINDINGS TO BE SOMEWHAT NEW PIECE-RATE SYSTEM RATHER THAN A TECHNIQUE FOR ANALYZING WORK AND IMPROVING METHODS. BOTH MANAGEMENT AND EMPLOYEES WERE SKEPTICAL OF PIECE RATES, BECAUSE MANY STANDARDS WERE EARLIER TYPICALLY BASED ON THE SUPERVISOR'S GUESS OR EVEN SOMETIMES INFLATED BY BOSSES TO PROTECT THE PERFORMANCE OF THEIR DEPARTMENTS.
IN JUNE 1903, AT THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS MEETING, TAYLOR PRESENTED HIS FAMOUS PAPER, "SHOP MANAGEMENT," WHICH INCLUDED THE ELEMENTS OF SCIENTIFIC MANAGEMENT: TIME STUDY, STANDARDIZATION OF ALL TOOLS AND TASKS, USE OF A PLANNING DEPARTMENT, USE OF SLIDE RULE AND SIMILAR TIMESAVING IMPLEMENTS, INSTRUCTION CARDS FOR WORKERS, BONUSES FOR SUCCESSFUL PER­ FORMANCE, DIFFERENTIAL RATES, MNEMONIC SYSTEMS FOR CLASSIFYING PRODUCTS, ROUTING SYSTEMS, AND MODERN COST SYSTEMS. TAYLOR 'S TECHNIQUES WERE WELL RECEIVED BY MANY FACTORY MANAGERS, AND BY 1917, OF 113 PLANTS THAT HAD INSTALLED "SCIENTIFIC MANAGE­ MENT," 59 CONSIDERED THEIR INSTALLATIONS COMPLETELY SUCCESSFUL, 20 PARTLY SUCCESSFUL, AND 34 FAILURES.
IN 1898, WHILE AT THE BETHLEHEM STEEL COMPANY , TAYLOR CARRIED OUT THE PIG-IRON EXPERIMENT THAT BECAME THE MOST CELEBRATED DEMONSTRATIONS OF HIS PRINCIPLES. HE ESTABLISHED THE CORRECT METHOD, ALONG WITH FINANCIAL INCENTIVES, AND WORKERS CARRYING 92-POUND PIGS OF IRON UP A RAMP ONTO A FREIGHT CAR WERE ABLE TO INCREASE THEIR PRODUCTIVITY FROM AN AVERAGE OF 12.5 TONS PER DAY TO BETWEEN 47 AND 48 TONS PER DAY. THIS WORK WAS PERFORMED WITH AN INCREASE IN THE DAILY RATE OF $1.15 TO $1.85. TAYLOR CLAIMED THAT WORKMEN PER­ FORMED AT THE HIGHER RATE "WITHOUT BRINGING ON A STRIKE AMONG THE MEN, WITHOUT ANY QUARREL WITH THE MEN AND WERE HAPPIER AND BETTER CONTENTED."
ANOTHER OF TAYLOR 'S BETHLEHEM STEEL STUDIES THAT BECAME FAMOUS WAS ON SHOVEL­ ING WORK. WORKERS WHO SHOVELED AT BETHLEHEM WOULD USE THE SAME SHOVEL FOR ANY JOB—LIFTING HEAVY IRON ORE TO LIFTING LIGHT RICE COAL. TAYLOR DESIGNED SHOVELS TO FIT THE DIFFERENT LOADS: SHORT- HANDLED SHOVELS FOR IRON ORE, LONG-HANDLED SCOOPS FOR LIGHT RICE COAL, AND SHOWED THEIR USEFULNESS IN IMPROVING PRODUCTIVITY.
NOT AS WELL KNOWN AS HIS ENGINEERING CONTRIBUTIONS IS THE FACT THAT IN 1881, HE WAS A U.S. TENNIS DOUBLES CHAMPION. HERE HE USED AN ODD-LOOKING RACKET HE HAD DESIGNED WITH A SPOON CURVED HANDLE.

THE WORK OF OTHERS
CARL G. BARTH, AN ASSOCIATE OF FREDERICK W. TAYLOR, DEVELOPED A PRODUCTION SLIDE RULE FOR ESTIMATING THE MOST EFFICIENT COMBINATIONS OF SPEEDS AND FEEDS FOR CUTTING METALS OF VARIOUS HARDNESSES, CONSIDERING THE DEPTH OF CUT, SIZE OF TOOL, AND LIFE OF THE TOOL. HE IS ALSO KNOWN FOR HIS WORK ON ESTIMATION OF ALLOWANCES BY ESTABLISHING THE NUMBER OF FOOT-POUNDS OF WORK A WORKER COULD DO IN A DAY. HE DEVELOPED A RELATIONSHIP IN WHICH A CERTAIN PUSH OR PULL ON A WORKER'S ARMS WAS EQUATED WITH THE AMOUNT OR WEIGHT THAT WORKER COULD HANDLE FOR A CERTAIN PERCENTAGE OF THE DAY.
HARRINGTON EMERSON APPLIED SCIENTIFIC METHODS TO WORK ON THE SANTA FE RAILROAD AND WROTE A BOOK, TWELVE PRINCIPLES OF EFFICIENCY, IN WHICH HE MADE AN ATTEMPT TO LAY DOWN PROCEDURES FOR EFFICIENT OPERATION. HE REORGANIZED THE COMPANY, INTEGRATED ITS SHOP PROCEDURES, INSTALLED STANDARD COSTS AND A BONUS PLAN, AND INTRODUCED HOLLERITH TABULATING MACHINES FOR THE ACCOUNTING WORK. THIS EFFORT RESULTED IN ANNUAL SAVING OF $ 1.5 MILLION AND RECOGNITION OF HIS APPROACH, CALLED EFFICIENCY ENGINEERING.
IN 1917, HENRY LAURENCE GANTT DEVELOPED SIMPLE GRAPH THAT WOULD PRESENT PERFORMANCE WHILE VISUALLY SHOWING PROJECTED SCHEDULES. THIS PRODUCTION CONTROL TOOL WAS ADOPTED BY THE SHIPBUILDING INDUSTRY DURING WORLD WAR I. FOR THE FIRST TIME, THIS TOOL DEMONSTRATED THE POSSIBILITY OF COMPARING ACTUAL PERFORMANCE AGAINST THE ORIGINAL PLAN, AND TO ADJUST DAILY SCHEDULES IN ACCORDANCE WITH CAPACITY, BACK­ LOG, AND CUSTOMER REQUIREMENTS. GANTT IS ALSO KNOWN FOR HIS WAGE PAYMENT SYSTEM THAT REWARDED WORKERS FOR ABOVE-STANDARD PERFORMANCE, ELIMINATED ANY PENALTY FOR FAILURE, AND OFFERED THE BOSS A BONUS FOR EVERY WORKER WHO PER­ FORMED ABOVE .STANDARD. GANTT ADVOCATED HUMAN RELATIONS AND PROMOTED SCIENTIFIC MANAGEMENT IN THE BACK DROP OF AN INHUMAN "SPEEDUP" OF LABOR.
MOTION AND TIME STUDY RECEIVED ADDED STIMULUS DURING WORLD WAR II WHEN FRANKLIN D. ROOSEVELT, THROUGH THE U.S. DEPARTMENT OF LABOR, ATTEMPTED TO ESTABLISH STANDARDS FOR INCREASING PRODUCTION. THE STATED POLICY ADVOCATED GREATER PAY FOR GREATER OUTPUT BUT WITHOUT AN INCREASE IN UNIT LABOR COSTS, INCENTIVE SCHEMES TO BE COLLECTIVELY BARGAINED BETWEEN LABOR AND MANAGEMENT, AND THE USE OF TIME STUDY FOR SETTING PRODUCTION STANDARDS.

REFERENCES : -

1. www.nptel.iitm.ac.in

Comments

  1. well and seeable again. But can you update some Scaffolding & Aluminium Scaffolding Chennai related keyword update your blog. Why means your blog is more attractive to me. Thanks...

    ReplyDelete

Post a Comment

Popular posts from this blog

APRON MECHANISM IN LATHE

APRON MECHANISM IN LATHE Apron Mechanism: Apron is attached to the carriage and hangs over the front side of the lathe bed. It is useful in providing power and hand feed to both carriage and cross-slide. It is also used to provide power feed to the carriage during thread cutting through two half nuts. The construction of apron is shown in Fig. Fig - Apron Mechanism Construction Power is transmitted from the spindle to the lead screw and feed rod through the spindle gear and tumbler gear arrangement. A worm is mounted on the feed rod by a sliding key. The worm meshes with a worm gear on whose axis another gear G1 is attached. Gear G1 is attached to a small gear G2 by a bracket as shown in the diagram. Gear G4 is positioned to be in mesh with the rack gear always. Another gear G3 is mounted on the same axis of gear G4. The carriage hand wheel meant for longitudinal feed is attached to the gear G5 on the same axis. The gears G3 and G5 are always in mesh. The gear G

Boiler Mountings - Dead Weight Safety Valve

DEAD WEIGHT SAFETY VALVE Function:- A valve is placed upon a valve seat that is fixed upon a long vertical pipe having a flange at the bottom for fixing at the top of the boiler. Suspended at the top of the valve is the weight carrier that carries cast iron rings. The total weight must be sufficient to keep the valve on its seat against the normal working pressure. When the steam pressure exceeds the normal limit, it lifts the valve with its weight & the excess steam escape through the pipe to the outside. This valve is used only with stationary type of boilers. It is the most elementary type of safety valve. The objection to dead weight safety valve is the heavy weight that has to be carried. Image - Dead Weight Safety Valve Figure - Dead Weight Safety Valve

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 1.60 3.0 1.80 4.0 2.00 5.0 2.20 6.0 MOTOR  CALIBRATION  CHART THEORY : WHENEVER THE DISTANCE BETWEEN THE DRIVING AND DRIVEN MEMBER, (BOTH SHAFTS ARE NOT OPERATING ON THE SAME A